Mini Project report format for JNTU

Guidelines About Industry Oriented Mini Project

The objective of this document is to present the general guidelines for the writing up of a proper mini-project report.

All JNTU B-Tech III-II have to do a industry oriented mini project which is implemented by JNTU from R05 batch.

We were very confused as to what we had to do as this was only a mini project on whether we have to go to industry,scope of project etc.But as in most colleges we were given choice to a study project or kit based and this could be done in an Institute,Industry or own.Most of chose to do a study project and were given permission for this and we had to submit this report as soon as IV/I starts and had to work on project in III/II break.This project will be evaluated during IV/II (Along with the Final or Main Project).

Basically in this mini project student can take up any Industry oriented application in his/her field of interest in their respective field/branch.First one has to submit an Abstract of the project to their concerned department head (HOD) and once he approves it ,he will assign a project guide to the individual or batch after this project work is to be started. Generally batch for a mini project may have 1 to 3 members in it.


Impotant Points:

1. There is no page limit only thing to be considered is that concept is complete.
2. One must acquire all data and concepts related to one's project.
3. The Format Guidelines given by respective Dept.heads for report layout.
4. Project should have good idustry oriented applications.
5.The industry oriented mini project shall be submitted in report form and should be presented before the committee, which shall evaluate for 50 marks.
The committee consists of an external examiner, head of the department, the supervisor of mini project and senior faculty member of the department.
6.There shall be no internal marks for industry oriented mini project.